Peterborough WtE project

Client: Babcock & Willcox Volund / Viridor
Location: Peterborough, United Kingdom
Period: 2014 - 2015
Type: Waste to Energy Plant
I/Os: 5000+

Design, implementation and commissioning
of distributed control system (DCS)
for the following process areas:

- Boiler Hall

- Turbine By-pass
- ACC (Air Cooled Condensers)
- Feed Water System
- Flue Gas Treatment
- High & Low Voltage Systems

1/3

© 2020 Copyright: VPU

  • Facebook - Grey Circle
  • LinkedIn - Grey Circle
VPU_LOGO_new.png